Project Tag: Water Strategy Development

Mine Water Transfer & Treatment Plant

Mine Water Transfer & Treatment Plant

Mine water transfer and treatment project designed for seasonal extraction at 65L/s. Used 8” layflat hose and 3” HDPE pipeline for water discharge. Focused on removing ammonia and nitrate using MBBRs with 432 m³/day capacity. Delivered full engineering from concept to permitting, optimizing processes to reduce cost and footprint.

Surf Parks Engineering Design and Regulatory Advisory Consultants

Surf Lakes – Engineering Design

Surf Lakes waterbody classification analysis and detailed water treatment reticulation study concurrent with detailed design of an Australian base Surf Park wave generation facility.

Mine Camp Water Management & Infrastructure Planning

Mine Camp Water Management & Infrastructure Planning

Conducted assessment of groundwater wells to provide potable water to the camp water treatment plant and reviewed septic storage and effluent system. Performed engineering review of camp drinking water system to confirm water sanitation and system function

Download Content

Please complete this short form to access the content.