Integrated Sustainability developed Barbados’ Blue Economy policy framework and strategic action plan, aligning energy, fisheries, coastal management, and water resources with climate resilience and economic growth.
VP, International
Integrated Sustainability has designed/built over 20 H2S scavenging skids, including 2 of the largest H2S scavenging skid packages in Alberta with each skid having the capacity to treat up to 10,000 ppm of total sulfur content.
Technical Director/Manager, Process Engineer
Integrated Sustainability assumed full operational responsibility for a water treatment plant 5 months into operation, optimizing moving bed biofilm reactor performance, closing commissioning gaps, and establishing reliable maintenance, operating, and reporting systems.
Director, Operations & Maintenance
Integrated Sustainability designed and supplied equipment for a 11,000 m³/d produced water recycling plant inclusive of two project phases. The project marked Canada's 1st commercial produced water reuse facility at this scale.
Technical Director/Manager, Process Engineer
Integrated Sustainability provides long-term operation and maintenance of a 60,000 gpd wastewater treatment plant serving a luxury marina development in Barbados, supported by remote monitoring and quarterly servicing.
VP, International