Project Tag: QA/QC

Bonanza Ledge Mine Water Treatment Plant Design Commissioning and Operations Support

Mine Water Treatment Plant

Water Treatment Plant Design, Commissioning, & Operations Support Project Overview Integrated Sustainability provided the design of treatment system upgrades,followed by commissioning of a moving bed biofilm reactor to address nitrogen removal. Once operational, the team transitioned into continuous operations support, providing experienced personnel and engineering oversight to maintain

Wastewater Containment Structures

Provided the siting, geotechnical investigation, preliminary/detailed engineering, regulatory package, procurement, and construction services required for 2 x 50,000 m3 saline water storage ponds in NE BC. Collected orthorectified imagery with an Unmanned Aerial Vehicle (UAV), which was used to provide periodic excavation and fill volumes. Provided onsite QA/QC construction services. Successful in obtaining approval from BC Regulator. Implementation of an innovative outtake system.

Produced Water Hub

The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store a combination of hydraulic fracturing fluid (flowback) and make-up source water, which could include saline groundwater, freshwater, or a combination of the two.

Freshwater Containment Structure

Site investigation & assessment, detailed reservoir and associated infrastructure design, contractor tender services, and on-site construction management services

Camp Earthworks Design

Geotechnical and civil design, procurement and construction support for the earthworks, drainage, access road for a long-term pipeline camp.

Download Content

Please complete this short form to access the content.