The Challenge
Two existing reservoirs of produced water storage ponds were identified by the client as leaking. The reservoirs were built to provide storage of produced water for hydraulic fracturing operations in the surrounding area within the Montney Shale formations. The client was looking to determine the cause of the leaks, and to complete repairs with minimal down time.
The Result
Integrated Sustainability provided inspection services to locate failure areas, detailed engineering design and quality assurance and quality control (QA/QC) and construction supervision of the repair of the existing leak detection riser system. and primary liner After completing the scope of work, the reservoir was returned to service and it was confirmed that the repairs were successful.