Turn-key Industrial Water Storage Facility
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.
Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds
Design-build turnkey delivery of nine H2S scavenging skids, including two of the largest H2S scavenging skid packages in Alberta.
Design, Build, Finance, and Operation of a dedicated 4,000 m3/d water treatment facility for on-demand water recycle. Provided the design and operation of the facility with guaranteed performance to
Provided the siting, geotechnical investigation, preliminary/detailed engineering, regulatory package, procurement, and construction services required for 2 x 50,000 m3 saline water storage ponds in NE BC. Collected orthorectified imagery
Developed a water reuse strategy to encourage water reuse to reduce operational costs and maintain the client’s social license to operate.
Integrated Sustainability was retained by the client to design a revised river intake that reduces the volume of sediment that is introduced into the raw water supply system. The
The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store
Site investigation & assessment, detailed reservoir and associated infrastructure design, contractor tender services, and on-site construction management services
Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store
A small section of a potable water main on Salt Spring Island was exposed within a creek crossing and sustained external damage. Integrated Sustainability was retained to replace the
Complete a fire protection system plan for one of the largest crude oil rail loading facilities in North America. This was required to demonstrate to the local municipality that
COPYRIGHT © 2024
INTEGRATED SUSTAINABILITY CONSULTANTS LTD.
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations. We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta. We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Please complete this short form to access the content.