The Challenge
Integrated Sustainability was retained by the client to design a revised river intake that reduces the volume of sediment that is introduced into the raw water supply system. The revised system is to provide increased reliability and easier maintenance. The new design would need to be completed and submitted to receive regulatory approval within a condensed timeline.
The Result
A design was prepared and successfully submitted to the regulatory authorities with an approval to construct being forthcoming. The scope of the project included field investigations, preliminary design, regulatory approval, detailed design, procurement construction support services.
ESG Project Benefits:
- Building resilient infrastructure with innovative solutions that minimizes disturbance