Environmental, Social, and Governance Report for an Integrated Producer
A fully-integrated Environmental, Social, and Governance strategy incorporating SASB Oil and Gas Exploration and Production framework and TCFD recommendations.
A fully-integrated Environmental, Social, and Governance strategy incorporating SASB Oil and Gas Exploration and Production framework and TCFD recommendations.
Discover how a materiality and risk assessment helped define the client’s ambitions, establish priorities, targets, and metrics; and develop an action plan for ESG implementation and improved performance from
A comprehensive and customized ESG reporting strategy that aligns with the SASB Oil and Gas Exploration and Production framework and references components of the core Global Reporting Initiative (GRI)
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.
Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds
Design-build turnkey delivery of nine H2S scavenging skids, including two of the largest H2S scavenging skid packages in Alberta.
Design, Build, Finance, and Operation of a dedicated 4,000 m3/d water treatment facility for on-demand water recycle. Provided the design and operation of the facility with guaranteed performance to
Provided the siting, geotechnical investigation, preliminary/detailed engineering, regulatory package, procurement, and construction services required for 2 x 50,000 m3 saline water storage ponds in NE BC. Collected orthorectified imagery
Developed a water reuse strategy to encourage water reuse to reduce operational costs and maintain the client’s social license to operate.
Evaluate 3 sites and several water intake technology options for a 60,000 m3 per day water intake on the Liard River in British Columbia.
Integrated Sustainability was retained by the client to design a revised river intake that reduces the volume of sediment that is introduced into the raw water supply system. The
The client requested that Integrated Sustainability conduct a water risk assessment that included the evaluation of source water, water use, and associated water-related risks in relation to its operations
COPYRIGHT © 2024
INTEGRATED SUSTAINABILITY CONSULTANTS LTD.
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations. We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta. We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Please complete this short form to access the content.