Water Intake, Water Treatment Plant & Storage Infrastructure
Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds
Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds
Evaluate 3 sites and several water intake technology options for a 60,000 m3 per day water intake on the Liard River in British Columbia.
Integrated Sustainability was retained by the client to design a revised river intake that reduces the volume of sediment that is introduced into the raw water supply system. The
Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store
Prepare, submit and gain approval for a Water Act Term License on a waterbody for which there are currently no approved term licences.
Alluvial aquifer characterization program to identify a reliable source of surface water infrastructure to support development activities.
Obtain a term licence under the Water Act from the Kakwa River as a supplement two 200,000 m3 and 400,000 m3 surface runoff reservoirs.
Evaluate the feasibility of surface water options for source water in two asset areas in the Smoky River in order to support decisions about where to put water intake
Feasibility evaluation of various surface water options for source water and preparation of a Water Act application for the selected option.
After completing the conceptual Intake design and alternative source evaluation, we were able to develop and submit the Water Act Term Licence application, and we provided technical support during
Evaluate the existing intake infrastructure for regulatory compliance, and provide risk mitigation options for operational changes.
Site identification, including review of existing geotechnical investigations, regulatory application, and selection of two water hub sites.
COPYRIGHT © 2024
INTEGRATED SUSTAINABILITY CONSULTANTS LTD.
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations. We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta. We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Please complete this short form to access the content.