The Challenge
The client required that a Water Act Term Licence be prepared, submitted, and approved for the Smoky River, which has multiple users and existing term licences.
The Result
Integrated Sustainability conducted an intake location evaluation on the Smoky River, conducting client water demand, hydrological, aquatic and environmental assessments at the chosen intake location.
After completing the conceptual Intake design and alternative source evaluation, we were able to develop and submit the Water Act Term Licence application, and we provided technical support during Alberta Energy Regulator Review.