Project Tag: Fresh Water Sourcing

Produced Water Hub

The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store

Freshwater Containment Structure

Site investigation & assessment, detailed reservoir and associated infrastructure design, contractor tender services, and on-site construction management services

Fresh Water Storage Pond

Site selection, crown land permit application and preliminary design for a 70,000 m³ fresh water storage pond

Pond Outtakes & Risers

Provide a preliminary design, support for an application for Water Act approval from the Alberta Energy Regulator (AER), and detailed design for a Pond and associated Pumped Outtake System,