Water Intake Engineering, Procurement, and Construction Management

Integrated Sustainability was retained by the client to design a revised river intake that reduces the volume of sediment that is introduced into the raw water supply system. The revised system is to provide increased reliability and easier maintenance. The new design would need to be completed and submitted to receive regulatory approval within a condensed timeline.

Produced Water Hub

The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store a combination of hydraulic fracturing fluid (flowback) and make-up source water, which could include saline groundwater, freshwater, or a combination of the two.

Freshwater Containment Structure

Site investigation & assessment, detailed reservoir and associated infrastructure design, contractor tender services, and on-site construction management services

Fresh Water Storage Pond

Site selection, crown land permit application and preliminary design for a 70,000 m³ fresh water storage pond

Pond Outtakes & Risers

Provide a preliminary design, support for an application for Water Act approval from the Alberta Energy Regulator (AER), and detailed design for a Pond and associated Pumped Outtake System, in the Duverney Shale Region in central Alberta.