Fresh Water Storage Pond

The Challenge

Integrated Sustainability was retained for the purpose of obtaining regulatory approvals from the BC Oil and Gas Commission (BCOCG) for a Crown Land and Section 8 approval for a 70,000 m³ self-filling fresh water storage pond.

The Result

Integrated Sustainability provided regulatory and civil services to the client to apply, permit and design a 70,000 m³ self-filling fresh water storage pond. A Crown Land application was prepared and submitted to allow the client to clear the site and build the pond. A Section 8 application is currently in the consultation and notification stage.