Mine Water Treatment Plant – Northern B.C.
Major constituent removal was focused on selenium and metals and was designed to treat water to environmental discharge criteria. The selenium treatment system can perform up to 6,500 m3/day.
Major constituent removal was focused on selenium and metals and was designed to treat water to environmental discharge criteria. The selenium treatment system can perform up to 6,500 m3/day.
Secondary treatment of HDS plant effluent and TMF supernatant to remove dissolved metals (particularly copper), nitrate, and selenium
Treatment of dissolved metals (Cd, Cu, Fe, Zn), as well as ammonia, from several underground sources prior to discharge into the environment.
Feasibility level engineering design and cost estimating for a mine water treatment plant.
Major constituents for removal included copper, cadmium, iron, arsenic, and ammonia. Plant designed for peak flows
Prime contractor accountable for project management, construction management, civil earthworks, geomatics, QA/QC, and post construction.
TSS management system utilizing innovative passive flocculation technology for water quality management in surface water event ponds.
provide support to the mine Water Group in support of mine closure planning. Requested deliverables included: Closure planning for decommissioned or soon-to-be decommissioned facilities; Dedicated disposal areas monitoring and
Decentralized wastewater treatment plant and disposal design for a large exploration camp in a remote location in the Yukon Territory. Extreme cold temperatures as low as -60°C were expected
Designed modular mobile treatment packages for a remote mine in the Golden Triangle region of BC. Treatment parameters focused on:
metals & arsenic removal, Ammonia removal and
contingency selenium
Process selection, process engineering, and construction management for a mine water treatment plant for metals removal, and advanced polishing for selenium removal.
Integrated Sustainability was commissioned to prepare a hydrogeological assessment in support of reopening a mine that has been in various stats of operation since the 1970’s.
Evaluation of options for a mine to replace base case diesel power with alternatives including solar, wind, biomass, fuel cells, and LNG along with comprehensive energy use modeling for
COPYRIGHT © 2024
INTEGRATED SUSTAINABILITY CONSULTANTS LTD.
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations. We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta. We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Please complete this short form to access the content.