Sustained Mine Water Treatment During Freshet
Project Highlights
Integrated Sustainability provided support for multiple mine water treatment plants, beginning with diagnostics and dosing assistance for the barium chloride circuit we then conducted onsite reverse-osmosis and nanofiltration membrane change-outs, we then provided rotating shifts to enable sustained continuous operations during critical spring periods.
Project Deliverables
- Provided diagnostics and adjustments for the barium chloride dosing circuit, including pump calibration, flow verification and system flushing procedures.
- Completed membrane element replacement campaign, removing and installing seventy-eight reverse-osmosis and nanofiltration membranes with daily progress and health-and-safety tracking.
- Mobilized water treatment engineers and operators on rotating two-week shifts to maintain continuous operations during critical spring periods.
- Provided standby engineering support for operational adjustments, procedure refinements and troubleshooting.