
Mine Water Treatment Plant Retrofit & Recommissioning
Designed for 40 m³/hr, this legacy mine water treatment plant retrofit included troubleshooting, bench-scale testing, and dosing optimization to guide reliable recommissioning.

Designed for 40 m³/hr, this legacy mine water treatment plant retrofit included troubleshooting, bench-scale testing, and dosing optimization to guide reliable recommissioning.

Delivered operational continuity at mine water treatment plants through operator mobilization, dosing circuit calibration, and membrane replacement—supporting mining operations through seasonal demand peaks.


Geotechnical and civil designs for staged expansion, slope stability, infiltration control, and discharge compliance for coarse refuse storage.

32,706m3/day mine water treatment plant, including a temperature-resilient moving bed bioreactor for year-round ammonia removal.

Developed mine waste management plan addressing acid-generating materials, permitting needs, and contact water monitoring at a reactivated mine site.

Feasibility study and engineering for consolidating two mine water treatment assets, based on mine plan, water chemistry, and timing analysis.

Adaptive water management framework and initial dilution zone modelling to guide discharge planning and compliance at a mine.
Please complete this short form to access the content.