Mine Water Treatment Plant Retrofit & Recommissioning
Designed for 40 m³/hr, this legacy mine water treatment plant retrofit included troubleshooting, bench-scale testing, and dosing optimization to guide reliable recommissioning.

Designed for 40 m³/hr, this legacy mine water treatment plant retrofit included troubleshooting, bench-scale testing, and dosing optimization to guide reliable recommissioning.

Designed for 3,000 m³/day, this mine water treatment plant evaluation improved dosing automation, integrated sludge systems, and delivered rapid troubleshooting to maintain compliance.

Low-density sludge water treatment system optimization for a mining client included site validation, infrastructure assessment, and conceptual retrofit planning to improve operability and environmental performance.

Delivered operational continuity at mine water treatment plants through operator mobilization, dosing circuit calibration, and membrane replacement—supporting mining operations through seasonal demand peaks.

Mining client required full operational support five months post-commissioning. Our team optimized treatment systems, developed tailored SOPs, and completed a gap analysis to support long-term care and maintenance operations.

Multi-phase inspection of a Canadian mine water treatment plant supported transfer to provincial authority. Structural, mechanical, and electrical systems were assessed, with risks identified and remediation plans delivered for reliable operations.
Please complete this short form to access the content.