3R’s (Reduce, Reuse and Recycle) for Climate Resilience Wastewater Systems in Barbados
Conceptual design to upgrade the two wastewater treatment facilities in Barbados (the Bridgetown & South Coast Wastewater Treatment Plants)
Conceptual design to upgrade the two wastewater treatment facilities in Barbados (the Bridgetown & South Coast Wastewater Treatment Plants)
Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds
Secondary treatment of HDS plant effluent and TMF supernatant to remove dissolved metals (particularly copper), nitrate, and selenium
Developed a water reuse strategy to encourage water reuse to reduce operational costs and maintain the client’s social license to operate.
Retrofit an existing water treatment plant (WTP) to soften and reduce silica to acceptable feedwater levels for drum pressure of 425 psig.
A study designed to provide a detailed overview of current operational conditions of a thermal energy plant, which consists of drafting piping and instrumentation diagram (P&IDs) and process flow
Flowback sampling and analysis for baseline characterization, norm management, and treatment recommendations for reuse. The sampling was performed to provide a baseline characterization of the N2-foam linear gel flowback
Scale formation in the client’s produced water pipeline has been a challenge, resulting in unnecessary pigging and chemical treatment costs. The client requested that Integrated Sustainability conduct and evaluation
The water treatment system will provide treatment of produced water generated from the client’s operations. The water treatment system will treat for total suspended solids, iron, hydrogen sulphide, and
Preliminary redesign of the Source Water Station (SWS) for a heavy oil facility to meet the demand of an upcoming expansion.
Preliminary treatment system design, regulatory permitting and process identification, and capital/operational cost estimate analysis of preliminary design.
Decentralized wastewater treatment plant and disposal design for a large exploration camp in a remote location in the Yukon Territory. Extreme cold temperatures as low as -60°C were expected
COPYRIGHT © 2024
INTEGRATED SUSTAINABILITY CONSULTANTS LTD.
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations. We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta. We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
Suite 204 — 5355 Avenida Encinas
Carlsbad, California, 92008,
USA
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
103-303 Wellman Lane
Saskatoon, SK, S7T 0J1
Canada
Please complete this short form to access the content.