site logo

Cogeneration Water Plant Upgrade

The Challenge

The major objective of the project was to retrofit the existing water treatment plant (WTP) to meet the water treatment performance criteria, ensuring that source water from the Peace River could be used for make-up to the steam generator circuit. The primary treatment requirement was to soften and reduce silica to acceptable feedwater levels for boiler makeup for an operating drum pressure of 425 psig.

The Result

The required treated water flow rate for the upgraded WTP was 420 US gallons per minute (gpm) average (nominal), 600 gpm peak flow. The upgrade WTP included use of existing equipment, both installed and in-service components and warehoused (i.e. not installed) components as well as new equipment. The process and equipment details were fully described in the proposal.

ESG Project Benefits:

  • Enhancing energy efficient infrastructure that reduces water and air pollution

Have Questions?

Let's Discuss​ Cogeneration Water Plant Upgrade

Nine H2S Scavenger Packages

Design-build turnkey delivery of nine H2S scavenging skids, including two of the largest H2S scavenging skid packages in Alberta.

Modular Mine Water Treatment Plant

Modular Mine Water Treatment Plant

Designed modular mobile treatment packages for a remote mine in the Golden Triangle region of BC. Treatment parameters focused on:
metals & arsenic removal, Ammonia removal and
contingency selenium removal.

Download Content

Please complete this short form to access the content.