The Challenge
The British Columbia Oil and Gas Commission (OGC) released a Management of Saline Fluids for Hydraulic Fracturing Guideline that requires quarterly groundwater monitoring and recommends a minimum of two baseline sampling events prior to operation of a Water Hub containment pond for produced water. Integrated Sustainability was retained to conduct a groundwater sampling program to support the Guideline requirements.
The Result
Integrated Sustainability developed and executed the following scope of work:
- Groundwater monitoring programs in summer and fall 2015.
- Preparation of a report summarizing the findings.