Fresh Water Storage Pond
Site selection, crown land permit application and preliminary design for a 70,000 m³ fresh water storage pond

Site selection, crown land permit application and preliminary design for a 70,000 m³ fresh water storage pond

Soils Assessment Program to determine if there are any areas of environmental concern and support a British Columbia Oil and Gas Commission (OGC) Certificate of Restoration (COR) for the site.

Appraisal and installation of large-scale industrial water source(s) for hydraulic fracturing and camp water supply for unconventional gas development in NE BC.

Meeting the requirements for the BC Oil and Gas Commission’s Management of Saline Fluids for Hydraulic Fracturing Guideline.

Successfully modify a KERMIT application to be one of the first prepared and submitted under the new AMS application system.

To select an appropriate pipeline route to carry an unconfirmed volumetric flow rate of natural gas to connect to a major transmission line connecting to the B.C. coast.

Design and installation of groundwater monitoring wells and ongoing groundwater monitoring at 21 produced water ponds