site logo

Project Tag: Frac Water

Produced Water Hub

The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store

Fracking Fluid Reuse Analysis

Prepare a sampling plan and conduct a compatibility analysis to assess feasibility of reusing hydraulic fracturing flowback for future completions.

Water Reuse Strategy Evaluation

Reduce the operational costs for trucking and disposal of frac flowback and produced water by reusing as much as possible during future completions.

Download Content

Please complete this short form to access the content.