site logo

Project Tag: Field Work

Baobab Solar Array

Agricultural operations can have significant power demands and can pay high electricity costs being tied into remote grid opportunities. Baobab farm was looking to reduce their energy cost.

Smoke Lake Term Licence Application

Design and gain approval for a long term water licence with a diversion of 1.9 million cubic meter/per year from Smoke Lake, an as yet un-gauged body of water.

River Water Intake

Integrated Sustainability was asked to perform a critical evaluation of an existing conceptual design for a new river water intake. In addition, the client also requested that Integrated Sustainability

Industrial River Intake Upgrade

To design an upgraded river intake that reduces the volume of sediment that is introduced into the raw water supply system. The revised system is to provide increased reliability

Download Content

Please complete this short form to access the content.