Produced Water Hub
The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store a combination of hydraulic fracturing fluid (flowback) and make-up source water, which could include saline groundwater, freshwater, or a combination of the two.
Market Assessment Evaluation
Evaluation for a merchant water business through a market assessment evaluation and identifying the potential business case for market entry.
Vancouver CORE Program Design Development
The Vancouver Airport required a third-party specialist expert review of a proposed rainwater harvesting and water treatment system
Strategic Water Security Management
Develop a Water Security Management Plan (WSMP) for a customer that required an very high quality of water for industrial steam generation.
Asset Water Strategy Development
An asset-level water strategy framework to manage water for the responsible, reliable, and cost effective development of assets at scale.
Engineering Consulting Services for Water Management
Evaluating water demand for a community potable water system along with identifying raw water reservoir development options
Water Security Management Plan
Develop a Water Security Management Plan (WSMP) with the goal of ensuring available source(s) of water to support future operations. The WSMP was also tasked with identifying suitable water disposal options, and ensuring the long-term viability and reliability of water sources and disposal zones.
Aerobic Landfill Conversion
Engineering design review, regulatory support, construction QA/QC, and comissioning to Convert approximately 62 acres of an existing landfill to an aerobic landfill designed to reduce methane content at the landfill and qualify for carbon credits.
Hydrogeological Assessment – Mining Operations
Integrated Sustainability was commissioned to prepare a hydrogeological assessment in support of reopening a mine that has been in various stats of operation since the 1970’s.
Disposal Well Options Evaluation
Establish the most feasible economic option for a new disposal well between a choice of re-completing an existing well or drilling a new one.
River Intake Evaluation and Application
Prepare, submit and gain approval for a Water Act Term License on a waterbody for which there are currently no approved term licences.
Riverbank Filtration (RBF) River Intake Pilot Study
Alluvial aquifer characterization program to identify a reliable source of surface water infrastructure to support development activities.