Water Hub & Intake Pipe
Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store
Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store
Selecting an appropriate pipeline route to carry and unconfirmed volumetric flow rate of natural gas to connect into a major transmission line
Integrated sustainability was tasked by their client to develop a flexible pipeline design. This design was required to meet a range of volumetric flow rates due to uncertain client
Preliminary redesign of the Source Water Station (SWS) for a heavy oil facility to meet the demand of an upcoming expansion.
Changing regulatory requirements surrounding the use of fresh water for Steam Assisted Gravity Drainage (SAGD) heavy oil extraction resulted in the need for this study. Through it, Integrated Sustainability
A small section of a potable water main on Salt Spring Island was exposed within a creek crossing and sustained external damage. Integrated Sustainability was retained to replace the
Predict the quantity and types of solids that will form in the disposal tank and in downstream disposal dumps, pipeline, and disposal well at an operating SAGD Central Processing
Geotechnical and civil design, procurement and construction support for the earthworks, drainage, access road for a long-term pipeline camp.
Full evaluation of costs and associated risk of two pipeline routes for water supply and wastewater disposal.
Modelling services for conceptual drawings, pump station needs analysis and technology selection, pipe material evaluation and selection.
Obtain landowner agreements to complete field investigations in a condensed, 3-week timeframe to prevent winter delays.
Successfully modify a KERMIT application to be one of the first prepared and submitted under the new AMS application system.
COPYRIGHT © 2024
INTEGRATED SUSTAINABILITY CONSULTANTS LTD.
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations. We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta. We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Please complete this short form to access the content.