
Water Hub & Intake Pipe
Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store and distribute 300,000 m³ of water between two storage ponds, while the Intake Pipeline utilized a pumping system to transport the water over 5.5 km from the source to the Water Hub.










