Project Tag: Pipeline Project Development

Water Hub & Intake Pipe

Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store

Pipeline Routing & Desktop Study

Selecting an appropriate pipeline route to carry and unconfirmed volumetric flow rate of natural gas to connect into a major transmission line

Preliminary Pipeline Design Development

Integrated sustainability was tasked by their client to develop a flexible pipeline design. This design was required to meet a range of volumetric flow rates due to uncertain client

Source Water Treatment & Pipeline Study

Changing regulatory requirements surrounding the use of fresh water for Steam Assisted Gravity Drainage (SAGD) heavy oil extraction resulted in the need for this study. Through it, Integrated Sustainability

Zero Lime Softening Engineering

Predict the quantity and types of solids that will form in the disposal tank and in downstream disposal dumps, pipeline, and disposal well at an operating SAGD Central Processing

Camp Earthworks Design

Geotechnical and civil design, procurement and construction support for the earthworks, drainage, access road for a long-term pipeline camp.

GW Resource Development

Full evaluation of costs and associated risk of two pipeline routes for water supply and wastewater disposal.