The Challenge
Integrated sustainability was tasked by their client to develop a flexible pipeline design. This design was required to meet a range of volumetric flow rates due to uncertain client targets and future projections.
The Result
A cost-effective design that will not require any additional compressor stations, and that is well suited for both the clients immediate needs and their long-term expansion plans was produced by the team at Integrated Sustainability. Based on the design, one pipeline permit will meet the clients needs for the next 30 years.