Project Tag: Permitting

Preliminary Pipeline Design Development

Integrated sustainability was tasked by their client to develop a flexible pipeline design. This design was required to meet a range of volumetric flow rates due to uncertain client

Wastewater Management Strategy

Preliminary treatment system design, regulatory permitting and process identification, and capital/operational cost estimate analysis of preliminary design.

Baobab Solar Array

Agricultural operations can have significant power demands and can pay high electricity costs being tied into remote grid opportunities. Baobab farm was looking to reduce their energy cost.