Turn-key Industrial Water Storage Facility
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.
Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds
Design-build turnkey delivery of nine H2S scavenging skids, including two of the largest H2S scavenging skid packages in Alberta.
Design, Build, Finance, and Operation of a dedicated 4,000 m3/d water treatment facility for on-demand water recycle. Provided the design and operation of the facility with guaranteed performance to
Final (Issued for Design) drawings for stormwater management concrete structures, inlet and/or outlet pipe size and material, etc…
Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store
Design and fabrication of Hydrogen Sulphide/Mercaptan Scavenging package for recovery of sulphur content from sour gas
The water treatment system will provide treatment of produced water generated from the client’s operations. The water treatment system will treat for total suspended solids, iron, hydrogen sulphide, and
Conduct a produced water reuse strategy, preliminary engineering design and site investigation, and detailed design for two water storage ponds and a produced water treatment facility.
An asset-level water strategy framework to manage water for the responsible, reliable, and cost effective development of assets at scale.
Preliminary redesign of the Source Water Station (SWS) for a heavy oil facility to meet the demand of an upcoming expansion.
Decentralized wastewater treatment plant and disposal design for a large exploration camp in a remote location in the Yukon Territory. Extreme cold temperatures as low as -60°C were expected
COPYRIGHT © 2024
INTEGRATED SUSTAINABILITY CONSULTANTS LTD.
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations. We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta. We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Please complete this short form to access the content.