Turn-key Industrial Water Storage Facility
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.

Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.

Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds

Design-build turnkey delivery of nine H2S scavenging skids, including two of the largest H2S scavenging skid packages in Alberta.

Design, Build, Finance, and Operation of a dedicated 4,000 m3/d water treatment facility for on-demand water recycle. Provided the design and operation of the facility with guaranteed performance to customer on fixed price $/m3 treatment.

Final (Issued for Design) drawings for stormwater management concrete structures, inlet and/or outlet pipe size and material, etc…

Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store and distribute 300,000 m³ of water between two storage ponds, while the Intake Pipeline utilized a pumping system to transport the water over 5.5 km from the source to the Water Hub.

Design and fabrication of Hydrogen Sulphide/Mercaptan Scavenging package for recovery of sulphur content from sour gas

The water treatment system will provide treatment of produced water generated from the client’s operations. The water treatment system will treat for total suspended solids, iron, hydrogen sulphide, and bacteria. Treated produced water will meet the client’s post-treatment requirements.

Conduct a produced water reuse strategy, preliminary engineering design and site investigation, and detailed design for two water storage ponds and a produced water treatment facility.

An asset-level water strategy framework to manage water for the responsible, reliable, and cost effective development of assets at scale.

Preliminary redesign of the Source Water Station (SWS) for a heavy oil facility to meet the demand of an upcoming expansion.

Decentralized wastewater treatment plant and disposal design for a large exploration camp in a remote location in the Yukon Territory. Extreme cold temperatures as low as -60°C were expected at the camp. Integrated Sustainability was approached to provide design details, procurement and construction support for the proposed infrastructure to serve the 400 person camp.
Please complete this short form to access the content.