Water Intake, Water Treatment Plant & Storage Infrastructure
Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds
Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds
Major constituent removal was focused on selenium and metals and was designed to treat water to environmental discharge criteria. The selenium treatment system can perform up to 6,500 m3/day.
Secondary treatment of HDS plant effluent and TMF supernatant to remove dissolved metals (particularly copper), nitrate, and selenium
Design-build turnkey delivery of nine H2S scavenging skids, including two of the largest H2S scavenging skid packages in Alberta.
Treatment of dissolved metals (Cd, Cu, Fe, Zn), as well as ammonia, from several underground sources prior to discharge into the environment.
Design, Build, Finance, and Operation of a dedicated 4,000 m3/d water treatment facility for on-demand water recycle. Provided the design and operation of the facility with guaranteed performance to
Feasibility level engineering design and cost estimating for a mine water treatment plant.
Major constituents for removal included copper, cadmium, iron, arsenic, and ammonia. Plant designed for peak flows
Developed a water reuse strategy to encourage water reuse to reduce operational costs and maintain the client’s social license to operate.
Retrofit an existing water treatment plant (WTP) to soften and reduce silica to acceptable feedwater levels for drum pressure of 425 psig.
Final (Issued for Design) drawings for stormwater management concrete structures, inlet and/or outlet pipe size and material, etc…
Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store
Zero liquid discharge technology evaluation for wastewater treatment and central processing facility operational cost reduction.
COPYRIGHT © 2024
INTEGRATED SUSTAINABILITY CONSULTANTS LTD.
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations. We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta. We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Please complete this short form to access the content.