site logo

Project Tag: Facility Design

Mine Water Treatment Plant – Northern B.C.

Major constituent removal was focused on selenium and metals and was designed to treat water to environmental discharge criteria. The selenium treatment system can perform up to 6,500 m3/day.

Nine H2S Scavenger Packages

Design-build turnkey delivery of nine H2S scavenging skids, including two of the largest H2S scavenging skid packages in Alberta.

Mine Water Treatment Plant – Northwest B.C.

Feasibility level engineering design and cost estimating for a mine water treatment plant.
Major constituents for removal included copper, cadmium, iron, arsenic, and ammonia. Plant designed for peak flows

Cogeneration Water Plant Upgrade

Retrofit an existing water treatment plant (WTP) to soften and reduce silica to acceptable feedwater levels for drum pressure of 425 psig.

Water Hub & Intake Pipe

Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store

Download Content

Please complete this short form to access the content.