Mine Water Treatment Plant – Golden Triangle

Project Execution

Highlights:
  • Located in the Golden Triangle just outside Stewart, B.C.
  • Treatment of dissolved metals (Cd, Cu, Fe, Zn) as well as ammonia from several underground sources prior to discharge into the receiving environment.
  • Ammonia removal design capacity = 240 m3/h.
  • Metals removal design capacity = 720 m3/h.
  • Major Process Equipment:
    • Moving Bed Biofilm Reactor Ammonia Treatment
    • High-Density Sludge Metals Removal Treatment
    • Clarification Unit
    • Process Tanks
    • Reagent dosing
  • Process selection, development, engineering, and cost estimation.
  • Engineering design delivered collaboratively with SRK Consulting.
ESG Project Benefits:
  • Sustainable management of water by treating water to meet environmental discharge criteria
  • Responsible water consumption through the re-introduction of water into the environment