Wastewater Containment Structures

Provided the siting, geotechnical investigation, preliminary/detailed engineering, regulatory package, procurement, and construction services required for 2 x 50,000 m3 saline water storage ponds in NE BC. Collected orthorectified imagery

Produced Water Hub

The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store

Freshwater Containment Structure

Site investigation & assessment, detailed reservoir and associated infrastructure design, contractor tender services, and on-site construction management services

Water Hub & Intake Pipe

Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store

Camp Earthworks Design

Geotechnical and civil design, procurement and construction support for the earthworks, drainage, access road for a long-term pipeline camp.

Pond Outtakes & Risers

Provide a preliminary design, support for an application for Water Act approval from the Alberta Energy Regulator (AER), and detailed design for a Pond and associated Pumped Outtake System,