Turn-key Industrial Water Storage Facility
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.
Provided the siting, geotechnical investigation, preliminary/detailed engineering, regulatory package, procurement, and construction services required for 2 x 50,000 m3 saline water storage ponds in NE BC. Collected orthorectified imagery
Prime contractor accountable for project management, construction management, civil earthworks, geomatics, QA/QC, and post construction.
The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store
Site investigation & assessment, detailed reservoir and associated infrastructure design, contractor tender services, and on-site construction management services
Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store
Engineering design review, regulatory support, construction QA/QC, and comissioning to Convert approximately 62 acres of an existing landfill to an aerobic landfill designed to reduce methane content at the
Geotechnical and civil design, procurement and construction support for the earthworks, drainage, access road for a long-term pipeline camp.
Provide a preliminary design, support for an application for Water Act approval from the Alberta Energy Regulator (AER), and detailed design for a Pond and associated Pumped Outtake System,
Preliminary design and application for Water Act approval and a detail design of a 300,000 m2 freshwater storage pond.
COPYRIGHT © 2024
INTEGRATED SUSTAINABILITY CONSULTANTS LTD.
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations. We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta. We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
300 — 701 Palomar Airport Road,
Carlsbad, California
USA
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
Please complete this short form to access the content.