Turn-key Industrial Water Storage Facility
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.

Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.

Provided the siting, geotechnical investigation, preliminary/detailed engineering, regulatory package, procurement, and construction services required for 2 x 50,000 m3 saline water storage ponds in NE BC. Collected orthorectified imagery with an Unmanned Aerial Vehicle (UAV), which was used to provide periodic excavation and fill volumes. Provided onsite QA/QC construction services. Successful in obtaining approval from BC Regulator. Implementation of an innovative outtake system.

Prime contractor accountable for project management, construction management, civil earthworks, geomatics, QA/QC, and post construction.

The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store a combination of hydraulic fracturing fluid (flowback) and make-up source water, which could include saline groundwater, freshwater, or a combination of the two.

Site investigation & assessment, detailed reservoir and associated infrastructure design, contractor tender services, and on-site construction management services

Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store and distribute 300,000 m³ of water between two storage ponds, while the Intake Pipeline utilized a pumping system to transport the water over 5.5 km from the source to the Water Hub.

Engineering design review, regulatory support, construction QA/QC, and comissioning to Convert approximately 62 acres of an existing landfill to an aerobic landfill designed to reduce methane content at the landfill and qualify for carbon credits.

Geotechnical and civil design, procurement and construction support for the earthworks, drainage, access road for a long-term pipeline camp.

Provide a preliminary design, support for an application for Water Act approval from the Alberta Energy Regulator (AER), and detailed design for a Pond and associated Pumped Outtake System, in the Duverney Shale Region in central Alberta.

Preliminary design and application for Water Act approval and a detail design of a 300,000 m2 freshwater storage pond.