Mine Water Treatment Plant Feasibility Design
Project Highlights
Integrated Sustainability completed feasibility studies and process design for treating legacy mine waste and new tailings. Key technologies included arsenic treatment, metals removal, and ammonia treatment.
Project Deliverables
- Formulated a comprehensive treatment concept to support preliminary feasibility stage planning for mine water management.
- Developed design concepts that supported both operational-phase water treatment and long-term closure requirements.
- Collaborated closely with the client to integrate water reuse strategies and reduce freshwater use over the mine life.
- Mapped treatment pathways to remove contaminants of concern, supporting environmental discharge targets under future closure conditions.
- Produced conceptual layouts and process diagrams to enable multi-stage treatment planning adaptable to seasonal and volumetric fluctuations.



