Water Intake, Water Treatment Plant & Storage Infrastructure
Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds
Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds
Design-build turnkey delivery of nine H2S scavenging skids, including two of the largest H2S scavenging skid packages in Alberta.
Design, Build, Finance, and Operation of a dedicated 4,000 m3/d water treatment facility for on-demand water recycle. Provided the design and operation of the facility with guaranteed performance to
Prime contractor accountable for project management, construction management, civil earthworks, geomatics, QA/QC, and post construction.
Retrofit an existing water treatment plant (WTP) to soften and reduce silica to acceptable feedwater levels for drum pressure of 425 psig.
Design and fabrication of Hydrogen Sulphide/Mercaptan Scavenging package for recovery of sulphur content from sour gas
Decentralized wastewater treatment plant and disposal design for a large exploration camp in a remote location in the Yukon Territory. Extreme cold temperatures as low as -60°C were expected
Detailed discipline engineering including plant layout optimization, and process piping design to maximize performance while reducing footprint and cost.
9 freshwater ponds and 5 produced water ponds on schedule and under budget with procurement, construction QA/QC, and groundwater monitoring.
Design a working water treatment system to suply high quality inlet water to supply two flow scenarios for production purposes.
Full consulting and EPCM services provided for nanofiltration water management and innovative best alternative power option solutions.
COPYRIGHT © 2024
INTEGRATED SUSTAINABILITY CONSULTANTS LTD.
We acknowledge that our Vancouver Office is located on the unceded territories of the xʷməθkʷəy̓əm (Musqueam), Sḵwx̱wú7mesh (Squamish), and Sel̓íl̓witulh (Tsleil-Waututh) Nations. We also acknowledge that our Calgary Office is located in the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta. We recognize and thank all these communities for having cared for these lands and waters and are grateful for the opportunity to be on this shared territory.
Canewood Business Centre, 1st Floor
5 Canewood Industrial Park
St. Michael, Barbados
BB11005
1600 — 400 3rd Avenue Southwest
Calgary, AB T2P 4H2
Canada
Suite 204 — 5355 Avenida Encinas
Carlsbad, California, 92008,
USA
620 — 1050 West Pender Street
Vancouver, BC V6E 3S7
Canada
103-303 Wellman Lane
Saskatoon, SK, S7T 0J1
Canada
Please complete this short form to access the content.