Water & Wastewater Treatment Facility

Project Execution

Highlights:

  • Design and construction of a potable water treatment plant with a minimum capacity of 600 m 3 /d.
    • Fully accountable for providing water as well as innovative best alternative power option solutions.
    • Completed a power options review that identified options to reduce the power demand necessary for building heat, and alternative sources that reduced dependence on provincial grid tie in.
    • To reduce costs Integrated Sustainability sourced equipment for retired US facility and retrofitted the design to suit.
  • Design and construction of a domestic wastewater treatment plant in a remote location.
    • Wastewater treatment effluent to sufficient quality for surface discharge and reuse.
    • To reduce costs Integrated Sustainability completed construction during off peak winter construction season.

Have Questions?

Let's Discuss​ Water & Wastewater Treatment Facility

Nine H2S Scavenger Packages

Design-build turnkey delivery of nine H2S scavenging skids, including two of the largest H2S scavenging skid packages in Alberta.

Produced Water Hub

The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store a combination of hydraulic fracturing fluid (flowback) and make-up source water, which could include saline groundwater, freshwater, or a combination of the two.