Bonanza Ledge Mine Water Treatment Plant Design Commissioning and Operations Support

Mine Water Treatment Plant

Water Treatment Plant Design, Commissioning, & Operations Support Project Overview Integrated Sustainability provided the design of treatment system upgrades,followed by commissioning of a moving bed biofilm reactor to address nitrogen removal. Once operational, the team transitioned into continuous operations support, providing experienced personnel and engineering oversight to maintain

Mine Water Transfer & Treatment Plant

Mine Water Transfer & Treatment Plant

Mine water transfer and treatment project designed for seasonal extraction at 65L/s. Used 8” layflat hose and 3” HDPE pipeline for water discharge. Focused on removing ammonia and nitrate using MBBRs with 432 m³/day capacity. Delivered full engineering from concept to permitting, optimizing processes to reduce cost and footprint.

Ammonia Sulphate Water Treatment Options Study

Conducted a study to determine treatment options for ammonium sulphate-impacted groundwater. Reviewed information, developed and ranked options, and created conceptual designs. Delivered a technical report with design sketches, mass and energy balances, risk assessments, and regulatory summaries.

River Water Intake

Integrated Sustainability was asked to perform a critical evaluation of an existing conceptual design for a new river water intake. In addition, the client also requested that Integrated Sustainability identify areas for design improvement and modifications, if necessary. As an output of the review process the client required an updated conceptual design, a regulatory road map for project execution and a Class 5 cost estimate for engineering and construction.