Turn-key Industrial Water Storage Facility
Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.

Prime contractor for all construction, construction management, procurement, QA/QC, of a 100,000 m3 lined freshwater storage reservoir.

Development of a 10,000 m3/day river water intake, water storage tanks, 10,000 m3/day treatment facility, and 200,000 m3 saline water storage ponds

Provided the siting, geotechnical investigation, preliminary/detailed engineering, regulatory package, procurement, and construction services required for 2 x 50,000 m3 saline water storage ponds in NE BC. Collected orthorectified imagery with an Unmanned Aerial Vehicle (UAV), which was used to provide periodic excavation and fill volumes. Provided onsite QA/QC construction services. Successful in obtaining approval from BC Regulator. Implementation of an innovative outtake system.

Site investigation & assessment, detailed reservoir and associated infrastructure design, contractor tender services, and on-site construction management services

Evaluating water demand for a community potable water system along with identifying raw water reservoir development options