
Regulatory Compliance Assessment & Management Plan
The client retained Integrated Sustainability to conducting a compliance assessment and the development of a regulatory maintenance plan

The client retained Integrated Sustainability to conducting a compliance assessment and the development of a regulatory maintenance plan

Provide hydrogeological and geospatial analytical services for the creation of a regional fluid disposal assessment in Alberta.

Integrated Sustainability has been retained for the amalgamation of biophysical data in anticipation of migration to a new data platform.

Comprehensive mine closure planning balancing operational, ecological, and social considerations to support responsible resource management and post-closure land use optimization

Decentralized wastewater treatment plant and disposal design for a large exploration camp in a remote location in the Yukon Territory. Extreme cold temperatures as low as -60°C were expected at the camp. Integrated Sustainability was approached to provide design details, procurement and construction support for the proposed infrastructure to serve the 400 person camp.

Designated process and water treatment support and process optimization and trouble-shooting at a SAGD facility.

Understanding geochemical interactions that take place between the disposal water and the target formation is vital to ensure successful and long-term disposal operations.

Regulatory support, geotechnical investigation, and preliminary engineering design, long term development plan and operations plan for a landfill expansion.

Developed a formal strategic plan for external stakeholders to efficiently and proactively identify potential risks on a former refinery.

Design and installation of groundwater monitoring wells and ongoing groundwater monitoring at 21 produced water ponds

9 freshwater ponds and 5 produced water ponds on schedule and under budget with procurement, construction QA/QC, and groundwater monitoring.
Please complete this short form to access the content.