Alaskan Mine Water Treatment Plant Design

Mine Water Treatment Plant Feasibility Level Design

Studied and designed solution for sustainable treatment concepts to be integrated into the active water management strategy. Provided background research on water volume and chemistry analysis. Supported engineering deliverables and supplied operating costs.

Mine Water Treatment Facility Design

Mine Water Treatment Plant Feasibility Level Design

Feasibility level engineering design and cost estimating for a mine water treatment plant.
Major constituents for removal included copper, cadmium, iron, arsenic, and ammonia. Plant designed for peak flows of 3,000 m3/day. The design included targeted treatment for arsenic and ammonia. Integrated Sustainability provided full process design, discipline engineering and cost estimating to support the feasibility level design development of the WTP. This includes Influent pre conditioning was investigated to reduce size of ammonia treatment system and reduce estimated plant TIC by $3.4 million.

Permian Basin Water Chemistry & Treatment Evaluation

Scale formation in the client’s produced water pipeline has been a challenge, resulting in unnecessary pigging and chemical treatment costs. The client requested that Integrated Sustainability conduct and evaluation to mitigate the scale formation as well as determine an optimal approach to reuse of produced water.

CO₂ to Synthetic Fuels Simulation

Analyze the energy and mass balance for five different process pathways to determine the most economic and feasible method for fuel synthesis fro CO₂ for a commercial scale synthetic fuels plant.

Fresh Water Storage Pond

Site selection, crown land permit application and preliminary design for a 70,000 m³ fresh water storage pond