
Environmental, Social, and Governance Report for an Integrated Producer
A fully-integrated Environmental, Social, and Governance strategy incorporating SASB Oil and Gas Exploration and Production framework and TCFD recommendations.

A fully-integrated Environmental, Social, and Governance strategy incorporating SASB Oil and Gas Exploration and Production framework and TCFD recommendations.

Discover how a materiality and risk assessment helped define the client’s ambitions, establish priorities, targets, and metrics; and develop an action plan for ESG implementation and improved performance from operations.

A comprehensive and customized ESG reporting strategy that aligns with the SASB Oil and Gas Exploration and Production framework and references components of the core Global Reporting Initiative (GRI) framework, the Task Force on Climate-Related Financial Disclosures (TCFD),

Evaluate 3 sites and several water intake technology options for a 60,000 m3 per day water intake on the Liard River in British Columbia.

Design and fabrication of Hydrogen Sulphide/Mercaptan Scavenging package for recovery of sulphur content from sour gas

Engineering design review, regulatory support, construction QA/QC, and comissioning to Convert approximately 62 acres of an existing landfill to an aerobic landfill designed to reduce methane content at the landfill and qualify for carbon credits.

Supporting landfill expansion design based on limited design information, and execution of geotechnical field investigations and installation of leachate extraction wells in the landfill, under poor site conditions.

Subsurface desktop study and field investigation, feasibility study and conceptual design for landfill optimization.

A comprehensive and detailed guide for an Alberta Class II landfill providing details regarding scope, schedule estimates, and design and regulatory considerations.

Regulatory support, geotechnical investigation, and preliminary engineering design, long term development plan and operations plan for a landfill expansion.

Obtain a term licence under the Water Act from the Kakwa River as a supplement two 200,000 m3 and 400,000 m3 surface runoff reservoirs.

Expand a landfill reaching it’s capacity with regulatory permittiung and application, geotechnical reporting, and detailed engineering design.
Please complete this short form to access the content.