
River Intake Evaluation and Application
Prepare, submit and gain approval for a Water Act Term License on a waterbody for which there are currently no approved term licences.

Prepare, submit and gain approval for a Water Act Term License on a waterbody for which there are currently no approved term licences.

Obtain a term licence under the Water Act from the Kakwa River as a supplement two 200,000 m3 and 400,000 m3 surface runoff reservoirs.

Evaluate the feasibility of surface water options for source water in two asset areas in the Smoky River in order to support decisions about where to put water intake infrastructure.

After completing the conceptual Intake design and alternative source evaluation, we were able to develop and submit the Water Act Term Licence application, and we provided technical support during Alberta Energy Regulator Review.

Design and gain approval for a long term water licence with a diversion of 1.9 million cubic meter/per year from Smoke Lake, an as yet un-gauged body of water.

Obtain a Term License for Diversion of 5m cubic meter/year and design infrastructure for a raw water intake, water pipeline, and water hub.
Please complete this short form to access the content.