site logo

Project Tag: Synthetic Liner Installation

Produced Water Hub

The client requested that Integrated Sustainability transform an existing borrow pit into a Lined Water Storage Pond/Water Hub in northeast British Columbia. The Pond will be used to store

Download Content

Please complete this short form to access the content.