River Bank Water Intake Filtration
Evaluate 3 sites and several water intake technology options for a 60,000 m3 per day water intake on the Liard River in British Columbia.

Evaluate 3 sites and several water intake technology options for a 60,000 m3 per day water intake on the Liard River in British Columbia.

Integrated Sustainability was retained to execute the design phase of the client’s Water Hub and Intake Pipeline infrastructure project. The Water Hub and associated infrastructure was required to store and distribute 300,000 m³ of water between two storage ponds, while the Intake Pipeline utilized a pumping system to transport the water over 5.5 km from the source to the Water Hub.

Evaluating water demand for a community potable water system along with identifying raw water reservoir development options

Reduce the operational costs for trucking and disposal of frac flowback and produced water by reusing as much as possible during future completions.