Water Management Infrastructure Engineering and Project Development Services
Engineering Services

Water Infrastructure & Treatment System Engineering

Improve water security and treatment efficiency with holistic designs

Water Resource Assessments, Studies and Consulting Services

explore our latest projects

Water Management Infrastructure Engineering and Project Development Services
Design Build Water & Wastewater Treatment Plant
Domestic Water Treatment Plant - Upgrade Design
Mining Water Infrastructure Development and Equipment
Food Manufacturing Wastewater Treatment Facility Design & Build
Freshwater Reservoir Design & Construction Management
Water Management Infrastructure Engineering and Project Development Services
Landscape-1920-x-960_0039_CCA-1
Constructed Wetland Pilot Study for Closure Water Treatment
Riverbank Filtration Water Intake Design & Installation
Water Treatment Plant Upgrade
Mine Water Treatment Plant Design
Mobile Mine Water Treatment Plant Design
Mine Water Treatment Gravel-Bed Bioreactor Design
Municipal Wastewater Treatment Plant Design

Canada’s 1st Commercial Scale Produced Water Recycling Plant – Treating 11,000 m3/d

Integrated Sustainability designed and supplied equipment for a 11,000 m³/d produced water recycling plant inclusive of two project phases. The project marked Canada’s 1st commercial produced water reuse facility at this scale.

600 m3/d Potable Water Treatment Plant Design & Build

Integrated Sustainability designed and built potable and wastewater treatment plants for an Indigenous community, delivering 600 m³/d capacity while reusing existing equipment and reducing grid reliance.

Water Treatment & Distribution System Upgrades

Integrated Sustainability designed permanent water treatment and distribution upgrades following emergency repairs, integrating a new well, replacement pumps, and improved disinfection for greater system reliability.

Canada’s 1st Commercial-Scale moving bed bioreactor (MBBR) Treating Selenium and Nitrate at 520 gpm

Integrated Sustainability delivered Canada’s first commercial-scale moving bed biofilm reactor (MBBR) system for selenium and nitrate removal from mine effluent. Full-service design, equipment supply, and field engineering supported a 520 gpm facility.

Food Manufacturing Facility Wastewater Treatment Plant

Integrated Sustainability supported installation and commissioning of a 23,000 L/d food manufacturing wastewater treatment plant, integrating dissolved air flotation and biological treatment without disrupting production.

228,500 m3 Lined Freshwater Reservoir Design and Construction Management

Integrated Sustainability designed and managed construction of a 228,500 m³ freshwater reservoir, integrating geotechnical investigation, water management, quality control, and on-site delivery.

153,600 m3 Freshwater Reservoir Construction Support

Integrated Sustainability supported construction of a 153,600 m³ unlined freshwater reservoir, integrating geotechnical design, dam safety classification, and commissioning documentation.

Capital Wastewater Plant Retrofit

Integrated Sustainability retrofitted pre-treatment infrastructure at Barbados’ 4,000,000 gpd capital wastewater plant, integrating automated screening equipment into live operations without a full shutdown.

2-Year Modular Constructed Wetland Pilot for Mine Closure Water Treatment

Integrated Sustainability advanced a passive constructed wetland treatment system through a 2-year pilot, combining controlled off-site testing and on-site trials to refine full-scale mine closure design.

Paper & Pulp Mill Water Intake Upgrade to 25,000 m3/d

Integrated Sustainability upgraded a British Columbia pulp and paper water intake using a riverbank filtration (RBF) system, delivering 25,000 m³/d through four vertical wells while improving supply reliability.

3,270 m3/d Retrofit of a Water Treatment System

Integrated Sustainability retrofitted a water treatment system with ultrafiltration and reverse osmosis, increasing boiler feedwater capacity to 3,270 m³/d while reusing existing equipment.

390 m3/hr Metals & Selenium Removal Water Treatment System Design

Integrated Sustainability designed a 390 m³/hr mine water treatment plant for metals and selenium removal, using phased treatment to address changing water chemistry through operations and closure.

Mobile Water Treatment Plant for a Remote Mine

Integrated Sustainability designed a 4,320 m³/d mobile mine water treatment plant for metals, arsenic, ammonia, and selenium removal, engineered for air-lift deployment to a remote B.C. site.

3,000 m3/d Bioreactor System for Ammonia Removal at a Copper Gold Mine

Integrated Sustainability designed a 3,000 m³/d mine water treatment plant integrating a gravel bed bioreactor and equalization pond for variable flows and long-term closure planning.

320,000 m3/d Municipal Wastewater Treatment Plant

Integrated Sustainability designed a 204,000 m³/d wastewater treatment plant expandable to 320,000 m³/d, integrating tertiary water reuse, renewable energy, and nutrient recovery.

Lifecycle Accountability for Industrial Water Assets

Combine deep technical expertise with execution and operational experience

Complex and high-consequence industrial projects require a practical mindset to enable agile development and positive environmental outcomes.

Our vertically integrated water services platform combines science, engineering, equipment fabrication, and operations to provide fit-for-purpose assets that drive accountability and performance.

bg-cta-service

Partner with an integrated team

Achieve greater performance and cost control with accountable infrastructure designed for high-consequence operations.