Health, Safety and Environment
project profile

Constructed Wetland Pilot Study for Closure Water Treatment

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

2-Year Modular Constructed Wetland Pilot for Mine Closure Water Treatment

project overview

Integrated Sustainability advanced design and testing of a passive constructed wetland treatment system through a 2-year pilot study. In the first year, we conducted off-site testing under controlled conditions to simulate closure water quality. The second year transitioned to on-site trials using modular mFlex systems. These efforts refined full-scale wetland designs to treat future mine water in closure scenarios and supported engineering deliverables.

project deliverables

  • Completed feasibility study and pilot system design.
  • Executed off-site and on-site pilot-scale testing.
  • Refined full-scale wetland treatment system design.
  • Managed data and reporting throughout the project.
  • Issued For Construction (IFC) drawings for implementation are pending delivery.
bg-cta

request a tailored
credentials pack

Please provide a brief explanation of your project requirements, and we will get back to you with a tailored credentials package ASAP.