Health, Safety and Environment
project profile

Freshwater Reservoir Design & Construction Management

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

228,500 m3 Lined Freshwater Reservoir Design and Construction Management

project overview

Integrated Sustainability completed the design of and provided construction management for a 228,500 m3 freshwater reservoir. Comprehensive geotechnical investigations guided site-specific design, while a unified team streamlined project execution.

project deliverables

  • Completed preliminary and detailed design of the clients freshwater reservoir and associated infrastructure.
  • Conducted a detailed geotechnical investigation to provide client with site-specific design recommendations.
  • Executed construction management, including tendering, on-site construction management services, and on-site quality assurance and quality control.
  • Used a single team for the site selection, design and construction management.
  • On-site management included daily field reporting to maintain compliance with the client health and safety policies.
  • Provided process/mechanical engineering for the surface infrastructure and the water management plan.
bg-cta

request a tailored
credentials pack

Please provide a brief explanation of your project requirements, and we will get back to you with a tailored credentials package ASAP.