Water Treatment Plant Upgrade From 2,453 m3/d to 3,271 m3/d

project overview

Integrated Sustainability conducted a feasibility study and subsequent design for an upgrade to a water treatment plant, increasing its capacity from 2,453 m3/d to 3,271 m3/d. The design enabled compliance with steam generation water quality standards.

project deliverables

  • Designed tie-in of a new well into the existing water system with updated routing, valving, and backflow protection.
  • Sized and specified upgraded distribution pumps to meet site pressure requirements and seasonal demand variability.
  • Prepared a wellhead protection plan outlining risk sources, protection zones, and recommendations for land use controls.
  • Delivered a revised operations and maintenance manual including updated procedures, system schematics, and safety protocols.
  • Confirmed system upgrades align with applicable drinking water standards and operational guidelines.
  • Provided recommendations for future automation and monitoring improvements to reduce operator burden.