Health, Safety and Environment
project profile

Eco-Adventure Park Wastewater Treatment Plant Operations & Maintenance

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

14,800 gpd Eco-Adventure Park Treatment System Operations

project overview

Chukka Caribbean Adventures retained Integrated Sustainability to support the operation and maintenance of a wastewater treatment facility servicing a major tourist attraction with a flow of 14,800 gpd in Barbados. Commissioned in 2009 and managed since 2013, the system has been maintained through a combination of predictive maintenance, part replacements, and weekly site visits to preserve continuous treatment reliability.

project deliverables

  • Delivered full-service operations and oversight including safety inspections, daily performance monitoring, and corrective maintenance.
  • Conducted scheduled preventive maintenance and process evaluations to reduce system failures.
  • Replaced equipment and components showing wear or failure under routine operating conditions.
  • Performed comprehensive inspections, cleaning, and operational testing to verify treatment consistency.
  • Provided labour, tools, and materials required to maintain effective operation over the life of the facility.
bg-cta

request a tailored
credentials pack

Please provide a brief explanation of your project requirements, and we will get back to you with a tailored credentials package ASAP.