Potable Water Treatment System Design, Build and Operate Services
project profile

Design, Build and Operations for a Purple Pipe Wastewater Treatment & Reuse Facility

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

225,000 gpd Residential Wastewater Treatment & Reuse Facility

project overview

The Villages at Coverly retained Integrated Sustainability to support the operation and maintenance of a wastewater reclamation treatment plant serving a large residential development in Barbados with a capacity of 225,000 gpd. Commissioned in 2009 and remotely managed since 2013, the system collects all residential greywater and wastewater through a centralized network and meets effluent discharge and reuse standards through tertiary treatment with nutrient removal.

project deliverables

  • Delivered comprehensive operational support services, including remote monitoring, site visits, and treatment system optimization.
  • Conducted preventive maintenance activities such as equipment inspections, safety checks, and cleaning of critical process units.
  • Implemented predictive maintenance measures to proactively address potential performance issues and component wear.
  • Replaced mechanical and electrical components affected by routine operational use to maintain system reliability and performance.
  • Performed full operational assessments and adjusted system parameters to maintain compliance with Class 1 treated water quality requirements.
  • Supplied all labour, equipment, and materials necessary to support uninterrupted treatment plant operations.