Landscape-1920-x-960_0019_SouthPoint
project profile

Residential Wastewater Treatment Plant Operations & Maintenance

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

12,000 gpd Beachfront Wastewater Treatment Facility Operations

project overview

Integrated Sustainability was retained by Sea Side Realty to support the long-term operations and maintenance of a wastewater treatment plant with a flow capacity of 12,000 gpd at a beachfront residential property in Barbados. Originally commissioned in 2005 and remotely managed since 2013, the system is maintained through scheduled site visits, proactive servicing, and remote monitoring to maintain reliable treatment performance.

project deliverables

  • Provided complete operations services, including remote monitoring and quarterly on-site visits.
  • Performed preventive maintenance activities such as inspections, equipment cleaning, and system calibration.
  • Executed predictive maintenance to reduce the risk of unplanned equipment failure and ensure continuous operation.
  • Replaced worn or defective mechanical and electrical parts resulting from normal use.
  • Conducted comprehensive operational checks to verify treatment effectiveness and system safety.
  • Supplied all labour, tools, and materials necessary to deliver consistent system performance.
bg-cta

request a tailored
credentials pack

Please provide a brief explanation of your project requirements, and we will get back to you with a tailored credentials package ASAP.