Regional Wastewater Pre-Treatment Facility Upgrade Design, Supply, & Installation

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

4,000,000 gpd Treatment Facility Upgrade

project overview

Integrated Sustainability was contracted to upgrade the South Coast Collection and Treatment Facility in Barbados, which receives 4,000,000 gpd from a densely populated coastal area. The team replaced aging equipment with a medium-fine screen and grit removal chamber, all integrated into live operations. The retrofit improved solids capture, minimized operator exposure, and reinforced the plant’s ability to protect coastal waters.

project deliverables

  • Prepared as-built documentation to guide retrofit integration into existing infrastructure.
  • Delivered custom-designed medium-fine screening and grit removal systems with suppliers to suit site conditions.
  • Installed washing, compacting, and bagging components for screened solids to improve operator hygiene and handling.
  • Removed obsolete screening and grit equipment without interrupting flow or plant functionality.
  • Executed all mechanical and electrical installation tasks within a live system, avoiding treatment disruptions.