Health, Safety and Environment
project profile

Red Mountain MWTP

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

Decentralizaed Wastewater Treatment System for 400-Person Camp

project overview

Integrated Sustainability designed a decentralized wastewater treatment and disposal system for a 400-person exploration camp in the Yukon. The system met effluent standards and enabled freeze protection, and environmentally safe discharge approved by the Yukon Water Board.

project deliverables

  • Achieved a decentralized wastewater treatment and disposal system for a 400-person camp in the Yukon Territory.
  • Designed a packaged wastewater treatment plant meeting required effluent standards.
  • Integrated a subsurface wastewater infiltration system for treated effluent discharge.
  • Engineered freeze protection measures to prevent freezing in pipes and infiltration fields in extreme temperatures.
  • Secured necessary permitting from the provincial water board for safe discharge.
  • Installed upgradient and downgradient groundwater sampling stations for environmental monitoring.
bg-cta

request a tailored
credentials pack

Please provide a brief explanation of your project requirements, and we will get back to you with a tailored credentials package ASAP.