Health, Safety and Environment
project profile

Mine Flocculant Management System Design & Implementation

Integrated Sustainability - Industrial Water Treatment Services and Equipment
project details

Passive Gel Block Treatment with Active Chemical Dosing and Manual Pump Control

project overview

Integrated Sustainability delivered a flocculant management program to reduce solids loading in mine water discharge by combining passive gel block treatment with active chemical dosing. System design and deployment targeted 2 sediment ponds with high-flow inflows, using flow-based thresholds to trigger treatment. By refining chemical selection, optimizing dosing infrastructure, and integrating monitoring protocols, the program provided operators with a responsive system to meet permit compliance during peak turbidity events.

project deliverables

  • Developed a flocculant management plan with site-specific turbidity thresholds linked to discharge permit compliance.
  • Designed and commissioned a dual-mode system using passive gel blocks and active dosing skids with manual pump control.
  • Prepared layouts identifying dosing locations to achieve required chemical contact and mixing time.
  • Reviewed jar test results to confirm coagulant and flocculant selection based on performance and toxicity thresholds.
  • Delivered operator training and site commissioning with guidance on inspection and dosage tracking.
  • Established monitoring protocols for turbidity, flow, and flocculant usage recorded twice daily.
  • Outlined adaptive management procedures for optimizing treatment performance under variable flow conditions.
bg-cta

request a tailored
credentials pack

Please provide a brief explanation of your project requirements, and we will get back to you with a tailored credentials package ASAP.